KEBBI STATE:
* Establishment of new Federal University at Kalgo
* SURE P Project on Primary Health Care
* Construction of Almajiri school
* Provision of Improved Cotton seedlings free of charge
for farmers
* Establishment of CBN cash office
* Building of Silos
* Establishment of a federal FM Radio
* Railway line
* Rehabilitation of federal roads
* Construction of new Library in Federal Unity Schools
* Construction of expert Crop Preservation &
Conditioning Centre
* Construction of Silos (100,000 metric tones capacity)
JIGAWA STATE:
* Establishment of new Federal University in Dutse
* Construction of Almajiri schools
* Establishment of a Federal Polytechnic
* Construction of a Laboratory blocks in Jigawa State
Polytechnic Dutse
* Flood Victims Palliative Scheme
* Dry Farming Project
* SURE – P Projects on Primary Health Care
* Construction of new Library in Federal Unity Schools
* Desertification Control Project: Establishment of 15
Row Green Belt(80Km) and Presidential Initiative on
Afforestation Program
KADUNA STATE:
* Rail line Zaria/Kaura Namoda rail route
* Abuja – Kaduna rail line
* Kaduna Airport remodelled
* Kaduna Refinery rehabilitation after 15 years
* SURE – P Projects in the State
Almajiri Schools
* Free improved Cotton Seedlings for farmers
* Dry Season farming Project
* Construction of new Library in Federal Unity school
* Revival of the Nigerian Textiles PLC Kaduna and its
employees re-engaged.
* Construction of Expert Preservation & Conditioning
Centre
* Ongoing work in Gurara Waterfalls and irrigation
projects
* Ongoing Kafanchan 2 x 60 MVA 32/33KV substation,
Kaduna – Jos 330kv Double – Circuit Line, 2 x 330KV
Line Bays Extension at Kaduna
* Kaduna Power plant – Mando Road 330kv Double –
Circuit Transmission Line and Substation Extension at
Mando Road substation 2nd Kaduna – Kano 330KV
Double – Circuit Transmission Line
* Ongoing 2 x 60 MVA, 132/33KV Substations at kwoi
and Kachia
* Establishment of a division of the National Industrial
Court in Kaduna
* Construction of a Storey cell block in Kaduna Prison
* Rehabilitation of Agric Skills Training Centre
* Federal Government College Rabah Road. Kaduna
laboratory refurbished.
* Galma Dam Water supply Kaduna State.
KANO STATE:
* Construction of new Airport Terminal/upgrading
* Provision of Railway Train Services (Lagoa – Kano)
* Upgrading Nigerian Police Academy in Wudil to a
University Status
* Rehabilitation of Kano – Kastina Federal Road
* Rehabilitation of 510Km Kano – Maiduguri Road
* Construction of Almajiri schools
* Desertification Control Projects
* Construction of new Library in Federal Unity school
* SURE – P project on Primary Health Care
* Dry Season Farming Projects
* Ongoing 1 x 30MVA, 132/33kv substation at Wudil
Kano State. Kano – Katsina 330KV Double – Circuit
Transmission Line and 2 x 60MVA, 132/33KV
Substation at Dambatta, Kano state
* Rehabilitation and Re -commissioning of the NNPC
depot in Kano.
* Construction of a storey block for 212 inmate at Kano
Central Prison
* Establishment of 80 Km of 15– row Green Belt and the
Presidential Initiative on Afforestation in Kano and other
10 Northern States.
ZAMFARA STATE:
* Rehabilitation of Funtua – Gusau – Sokoto Road
* Establishment of a new Federal University Gusau in
January 2013
Almajiri |Schools construction
* SURE- Projects on Primary Health Care (PHC)
* Dry season farming Project
* e-wallet System for farmers
* Construction of new Library in Federal Unity school
* Rehabilitation of Namoda Jiba Road Section iv in
Zamfara State
* Rehabilitation of Dangulbi Road in Zamfara, Mainchi –
Anka Daki Takwa Road
* Construction of Silos (100,000 metric tons capacity)
* Rehabilitation of the NNPC Depot in Gusau
* Construction of Agricultural Skills Training Centre
* Establishment of Cancers treatment Centre at the
Federal Medical Centre Gusau
SOKOTO STATE:
* Lagos – Sokoto Railway Project approved March 2014
* Rehabilitation of Funtua – Gusau – Sokoto Road
* Dry Season farming Project
* Construction of Almajiri schools
* Provision of Improved Cotton Seedlings free of Charge
for farmers
* Desertification Control Project: Presidential Initiative
on Afforestation
* Relief ( Palliative Scheme) for flood victims
* SURE P Projects on Primary Health Care
* Construction of new Library in Federal Unity schools
* e- wallet System in the distribution of farming inputs
supply
* Rehabilitation of the Shagari irrigation Project
* Rehabilitation of Sokoto Airport
* Construction of Silos (100,000 metric tones capacity)
* Goronyo Dam Emergency Spill Repairs (Water
Supply) Sokoto
KATSINA STATE:
* Establishment of a new Federal University in Dutsin-
ma Katsina State
* Construction of Almajiri Schools ( Modern Tsangaya
School System)
* e- wallet System for farmers
* Free improved Cotton Seedlings for farmers
* Rehabilitation/ consruction of Kano – Kastina Road
* Rehabilitation of Kastina – Daura Road
* Dry Season Farming Project
* SURE P Project on Primary Health Care and others
* Desertification Control Project
* Rehabilitation of the Umaru Yar’Adua International
Airport Katsina
* Construction of Silos (100,000 metric tones capacity)
* Construction of Kankara Gurbi road.
* Ongoing Daura 2 x 30/40MVA substation and 2 x
132KV Line bay extension at Katsina.
* Grid Rehabilitation and Reinforcement in Katsina
Substation, Kano – Katsina 330KV Double – Circuit
Transmission Line, 2 x 150MVA, 330/132KV + 2 x
60MVA, 132/33KV Substation at Katsina, Katsina –
Kurfi – Dutsinma – Kankara – Malumfashi 132KV
Double Circuit Line, Sub Power Stations in Kurfi (2 x
60MVA, 132/33KV), Dutsinma, Kankara and
Malumfashi substation, Kumbotso (Daura) – Dambatta
132KV Line and Katsina – Daura 132KV Double Circuit
Line.
* Construction of a Storey building Administrative Block
and 36 Units of One Bedroom at Katsina by the Nigerian
Security & Civil Defence Corps (NSCDC)
* Presidential Initiative on Aforestation
* 80% Completion of the rehabilitation of existing
infrastructure at Jibia Irrigation Projects
* Construction of 10MW Wind Energy Generation
Companies in Katsina
NORTH CENTRAL GEO POLITICAL ZONE
KOGI STATE:
* Establishment of a new Federal University in Felele –
Lokoja
* Dualization of the 212 Km Lokoja – Abuja Road,
Lokoja Okene – Benin Road
* SURE – P Projects on Primary Health Care
* e-wallet System for farmers in the distribution of
Agricultural Inputs and Dry season Farming Projects
* 434 mw Geregu Power Generating Plant ii completed
and commissioned in October 2013
* Aladja – Ajaukuta Rail fixed and tested
* Kogi state is one of the states proposed for the three
Green Field Refineries of the NNPC in alliance with
CSECC (Kogi Green Field Refinery Itobe village Kogi
State)
Jamata River Port at over 50% completion
* Establishment/ Construction of a federal High court
* Palliative Scheme for flood victims in Kogi State
* Food Processing Centre with a capacity of 25,000
metric tones silos
* Ongoing 2 x 60MVA, 132/33KV substation at Egbe, 2
x 60 MVA and 2 x 132KV line bays extension at
Obajana, Lokoja – Obajana 330kv double – circuit line
and 330/132kv substation at Obajana.
* Ongoing 132/33kv substation at Ayangba, Kogi State
* Construction of Lokoja River Port and Jetties at Idah
NASARAWA STATE:
* Establishment of a new Federal University in Lafia
* Road Rehabilitation; Lafia – Makurdi Road
* SURE – P Projects on Primary Health Care (PHC)
* Construction of new library in the Federal Unity
School
* Rehabilitation /construction of Lafia – Doma road,
Lafia – Obi – Awe Road , Nasarawa – Karshi – Ara
Road
* Construction of the Loko – Oweto Bridge linking
Nasarawa and Benue States
* Establishment of Central Bank Lafia
* Karshi Power Transmission Station
* Lafia Power Sub – Station
* Doma Dam 375million cubic meters of water for
irrigation
* Four storey Federal Secretariat, Lafia with 402 offices
constructed
* Federal High Court complex constructed
* Distribution of computers and internet broadband to
schools
* Construction of Faculty of Arts Lecture theatre in
Nasarawa State University Keffi by the federal
Government through the Tertiary Education Trust Fund,
and the construction of the faculty of Administration
lecture theatre, Faculty of Social Science lecture theatre
and construction of Academic staff office complex.
* The CBN intervention project in Nasarawa State
University; Construction of the school of Post Graduate
Studies Complex.
* Construction of Export Crop preservation Conditioning
Centre
* Provision of Portable drinking water at Nasarawa state
University Keffi
* Establishment of Cancers Treatment Centre at the
Federal Medical Centre Keffi
* Construction of 3 MDG/NDE Skill Acquisition Centres
in each of the three Senatorial Districts of Nasarawa
State
NIGER STATE:
* Dualisation of Suleja – Minna Road
* Construction of Almajiri Schools
* Dry Season Farming Project
* Baro Ports on Niger State which was conceived in
1954 came to live under President Jonathan
* Construction of Yar’Adua Hospital for highway
emergency response at Sabon Wuse
Railway Line system
* Rehabilitation of Federal Roads
* e –wallet System in the distribution of Agricultural
Inputs to the farmers
* Construction of Bida – Sacci – Nupeko Road
* Construction of River Ebba at Cheche, Katcha L.G. A.
Area in Niger State.
* Ongoing Grid Rehabilitation and Reinforcement in
Kontagora Substation
* Rehabilitation and re-commissioning of NNPC Depot
in Suleja and Minna
* Equipped Mathematics and Chemistry Laboratories at
the Federal Government Academy, Suleja
* Establishment of Maritime Institute at Ibrahim
Badamasi Babangida University Lapai
BENUE STATE:
* Rehabilitation of Rail way lines
* Rehabilitation of Lafia – Makurdi Road, Aliade to
Uturkpo Road
* SURE – P Projects in the state
* Construction of new library at the Federal Government
College Otobi, Benue state
* Supply of new improved seedlings to boast groundnut
and sorghum production
* Palliative reliefs for the Flood victims
* Construction of Perishable Cargo Terminal in Makurdi
* Ongoing construction of Oweto Bridge to link Benue
and Nasarawa State (70% Completed)
* Ongoing reconstruction of Makurdi – Gboko, Wannune
– Yandev Section Road
* Completion of the Greater Makurdi Water Supply
Scheme
* Construction of Oju – Obussa – Ainu Road
PLATEAU STATE:
* Rehabilitation of Federal Roads: Manchok Vom road
* Construction of the Faculty of Social Science, Faculty
of Post Graduate Studies, International * Conference
Centre and hostels in University of Jos Funded by CBN
through TET Fund.
* 120Mw Power sub- station in Makeri- Jos Completed.
* Panshin Sub power Station
* SURE – P (Subsidy Re –investment Programme)
Projects in the state
* Rehabilitation of Railway line from Kuru Station in
Plateau state to Bauchi station
* Construction of Barkin Ladi Dam in Plateau state
* Rehabilitation of buildings at Police Staff College Jos
* e- Wallet for Farmers and Dry Season Farming
Projects.
* Construction of Jarmai – Bashar road and rehabilitation
of Bashir – Dengi road
* Ongoing Kaduna – Jos 330kv double – circuit line, 2 x
330kv line bays extension at Jos substation
* Construction of Perishable Cargo Terminal in Jos.
* Rehabilitation and re – commission of the NNPC depot
in Jos
* Completion of the Mangu Water supply
KWARA STATE:
* Ilorin – Ibadan Road Fixed
* Almajiri schools
* e-wallet system in distribution of Agricultural inputs to
farmers.
* SURE – P Projects (Primary Health Care)
* Rehabilitation of the Lagos – Jebba – Kano Rail Line,
and Ilorin – Offa rail line.
* Rehabilitation of Ilorin International Airport
* CBN Project at Offa Grammar school
* The Federal Government under ETF granted Uni-
Ilorin ₦4.2 Billion in 2012 for the Unilorin Geological
Research and Resort Centre at Aran – Orin, new faculty
of Arts and Faculty of Education, Multi – Purpose hall, a
central Research Laboratory and the automation of the
University Library.
* Dry Season farming in Kwara State at
Tada – Shonga irrigation farm project
* Irrigation Dam Project in Eyekonrin – Araromi
* Ongoing 2 x 132kv line bays extension at Omu Aron
* Construction of Perishable Cargo Terminal in Ilorin
* Shonga Power sub – station
* Supply of Instructional Materials to Federal
Government College Ilorin

SOUTH EAST GEO – POLITICAL ZONE
ENUGU STATE:
* Rehabilitation of the Enugu Airport (New airport
Terminal)
* Ongoing Nsukka – Ayangba 132kv Double – Circuit
* Sure – P Projects on Primary Health Care (PHC)
* Enugu – PH – Maiduguri Rail Fixed.
* University of Nigeria Teaching Hospital Enugu
upgraded with new facilities to commence open – heart
surgeries
* Rehabilitation of Enugu – Port Harcourt Road
* Ogrute – Umuida Road and Unadu to Odoru in Kogi
State
* Rehabilitation of Umuna – Ndiagu and Ebenebe to
Ezeagu Road, Agubuogu through Ebenebe to Iwolo road.
* ₦ 2.57 Billion Dam Project in Adada River Dam to
provide Portable Water, Electricity and Irrigation for
agriculture activities
* Ada Rice Irrigation Project at Uzo – Uwani
* Erosion control project
* Export Crop preservation and Conditioning Centre in
Enugu State (One of the 10 constructed nationwide )
* e – wallet System in the distribution of agricultural
inputs to the farmers and Dry Season Farming Project
* Construction of Irrigation Facilities in Amagunze Rice
Product farm Enugu
* Establishment of Enugu State office of the National
Productivity Centre.
* In 2012, FG Commissioned a Cultural Industry Centre
in Inyi Enugu State.
* Reinstatement of washout at Km 6 + 750, Km 30 + 400
and Km 35 + 325 along Onitsha- Enugu Dual – Carriage
way in Anambra and Enugu State.
* Establishment of Maritime Institute at University of
Nigeria Nsukka
EBONYI STATE:
*Establishment of a Federal University in Ndufe – Alike
in Ebonyi State
Rehabilitation of 43 KM Obiozara – Uburu – Ishiagu
Road
37Km Oji – Achi Obeagu – Maku – Awgu – Ndeabor –
Mpu – Okpanku – Akaeze Road rehabilitation.
Construction of a Storey Hostel, Class room building and
Procurement at the Federal Government Girls College
Ezembo, Ebonyi State
Sure – P Projects on Primary Health Centres and others
Rehabilitation of Abakaliki – Mbok Road
Establishment of a New Teaching Hospital
e – wallet system for the Distribution of Agricultural
Inputs to the farmers and Dry Season Farming Project
Ongoing 2x 60MVA, 132/33KV Substation at Amasiri
and 2 x 13KV Substation at Abakaliki and Abakaliki –
Amasiri 132KV Double – Circuit Line
Rehabilitation of Agricultural – Skills Training Centre.
Establishment of National Obstetric Fistula Centre
Abakiliki
ANAMBRA STATE:
Building of Aircraft Maintenance School at Akili –
Ozuzo, Ogbaru Local Government Area.
Construction of Federal Government Secretariat in Awka
Exploring Public Private Partnership to Reconstruct
Second Niger Bridge (Anambra – Delta States)
FGN Funded Ecological Projects in Anambra State :
Nanka/Oko Landslide Project, the Nkisi Water Works
Erosion Control/Dredging Projects in Onitsha, the
Okpolo/Ire Ojoto Erosion Control Project, Alor Town
Flood Control and Road Improvement Projects in Idemili
Local Government Area
Rehabilitation of Onitsha – Owerri Road to Okija –
Ihembosi – Afor – Ukpor – Ebenator – Ezenifite
Onitsha River Port – Fixed and ready
National Transmission Grid installed between Benin and
Onitsha to prevent usual Nationwide Grid collapse
Sure – P Projects on Primary Health Care &
Transformation
e – Wallet System in the distribution of agricultural
inputs to the farmers and Dry Season Farming
Ongoing Nnewi 2 x 60MVA, 132/33KV Substation 2 x
60MVA, 132/33KV Substation at Oba and 2 x 132KV
Line Bays Extension at Nnewi, 2 x 60MVA, 132/33KV
Substation at Mpu with 2 x 60KV Line Bays Extension
at Nnenwe
Onitsha – Oba – Nnewi – Ideato – Okigwe 132KV
Double – Circuit Line, Ugwuaji Nnenwe 132KV Double
– Circuit Line 2 x 60MVA,132/33KV Substation at
Nnenwe
Nnenwe – Mpu 132KV Double – Circuit Transmission
Line, Onitsha – Ifitedunu and 2 x 132KV Double –
Circuit Transmission Line, 2 x 60MVA, 132/33KV
Substation at Ifitedunu and 2 x 132KV Line Bays
Extension at Onitsha.
Modernisation of Nnamdi Azikwe University Teaching
Hospital Nnewi
IMO STATE:
NDDC Projects: St Marks Estate and Federal Housing
Estate Internal Road, New Owerri Ejizie – Izuogu Road
in Akeme community of Arondizogu, and the Solar
Powered Water Project at Mbaoma in Owerri North &
Owerri Urban Water Scheme Project, Rehabilitation of
Opkpuala – Iguruta Road(Imo and Rivers States),
Reconstruction of Elele – Owerri Road
Sea – Port and Naval Base Project in Osse – Motor
Community (World Bank /FGN/Imo state) sponsored
project.
Construction of Administrative Complex and
Entrepreneurial Studies Complex in Federal University of
Technology Owerri (FUTO)
Construction of the new Federal High Court Owerri
division complex
Establishment and Construction of a Court of Appeal
Division in Owerri
14Km Mbaise – Ngwa Road with a bridge at Imo/ Abia
State (Cost ₦2.94Billoin)
SURE – P Project on Primary Health Centres and other
projects
Rehabilitation of Owerri – Port Harcourt Road
Ecological Control Projects at Nekede, Saint Kzito
Secondary School in Muchina and the Umuoza – Ugri
Erosion Control
Rehabilitation of the Sam Mbakwe International Airport
Owerri
Egbema Power Plant (338MW)
e-wallet System in distribution of the agricultural inputs
to the Farmers and Dry Season Farming Project
Ongoing Mbalano 2 x 30/40MVA, 132/33KV Substation
and Okigwe 2 x 30/40MVA , 132/133KV Substation
Dualisation of Ada Owerri – Ikot – Ekpene Border
Section Phase one in Imo, Abia and Akwa –Ibom States
Construction of Oguta River Port in Imo State
ABIA STATE:
Completion of Alaoji Power Plant (1074MW)
SURE – Projects on Primary Health Care (PHC) and
others
MDG Projects ( in partnership with the state
Government) 250 Health Centres and 10 Solar Powered
Water Boreholes completed and commissioned
Rehabilitation of the Federal Roads: Mbaise – Ngwa
Road with a bridge and Owerri – Aba Road
504MW Power Plant at Aba and 133KVA Substation in
Umuahia (Under the Federal Government/Abia state
Partnership Projects)
e – wallet system in the distribution of Agricultural
Inputs to the farmers and Dry Season farming projects
Umuahia – Mbalano 132KV Line
Mbalano 2 x 30/40MVA, 132/33KV Substation
Ohafia 2 x 30/40MVA, 132/33KV Substation and Ohafia
– Arochukwu 132KVA Line
Okigwe 2 x 30/40 MVA, 132/33KV Substation
Ongoing Ohafia 2 x 30 /40 MVA, 132/33KV Substation
Umuahia – Ohafia 132KV Single – Circuit Line,
Umuahia – Mbalano 132KV Line, Ohafia – Arochukwu
132KV Line
Rehabilitation and Re – opening of the NNPC depot at
Aba after 6years of closure.
Rehabilitation and Construction of Goodluck Jonathan
Barrack in Ohafia
Establishment of Abia State Office of the National
Productivity Centre.
Rehabilitation of Agricultural Skills Training Centre
NDDC – Obehia – Azumini – Ukanafun Road (Abia –
Akwa Ibom) Roads Projects
Construction of a storey building for 136 Inmates at Aba
Prison.

SOUTH WEST GEO – POLITICAL ZONE
ONDO STATE:
Omotosho I Power Plant Completed and commissioned
Omotosho II Power generating plant built from the
scratch and commissioned.
Akure Airport One of the nine Airports remodelled
Benin – Ore – Shagamu duel carriage way rehabilitated
after years of neglect
Akure – Ilesa express way rehabilitation
Sure – P Projects on Primary Health Care and
Transportation
Erusu/ Arigidi Dam in Akoko North West Area of Ondo
State under Benin – Owena River Basin Development
Authority (BORBDA)
e – wallet System in Agricultural Inputs supply to the
farmers
Dry Season Farming Projects
NNDC has a total of 589 Projects in Ondo State out of
which 317 are already completed while 15 Mega Projects
are ongoing such as Township road in Ugbo – nla, bore
holes, interlocking road project, solar powered street
light Projects etc.
Rehabilitation of Ipele – Idoani Road.
Construction of Federal Highway Emergency Clinics
(Oka, Isua Akoko)
Periodic Maintenance of Akure – Owo Road.
2 x 60MVA, 132/33KV Substation at Okeagbe Akoko
2 x 60MVA, 132/33KV Substation at Ose Local
Government Area Headquarters Ondo State.
New Akure 2 x 150MVA, 330/132kv + 2 x 60MVA,
132/33KV Substation.
NDDC Water Project at Ukparam, ondo state
Establishment of a new Fed. Polytechnic at Ile – Oluji
In 2012, FG Commissioned at Cultural Industry Centre
in Owo
Construction of MDG/NDE Skill Acquisition Centres in
each of the 3 Senatorial districts of Ondo State.
Construction of Jetties at Igbokoda.
LAGOS STATE:
Lagos – Kano Rail Revival Commissioning of New Air
Conditioned Train Coaches and other rail way Services
in Lagos
SURE – P Projects on Primary Health Centre.
e – Wallet System in the distribution of the agricultural
inputs to the Farmers and the Dry Season Farming
Projects.
Construction of Adiuyan water works phase II near
Lagos
Third Mainland Bridge phase 2
Apapa – Orile – Mile 2 – Cele, Oshodi road rehabilitated
The Federal Government under writes a ₦40B loan for
infrastructural and educational development in Lagos
(2014)
Rehabilitation of the Muritala Muhammed International
Airport Lagos
Lagos – Sagamu road rehabilitated
Installation of 1000 Close Circuit Television (CCTV)
cameras to boost security of lives and property
Ikorodu – odogunyan – Shagamu 132KV double circuit
transmission line
2 x 60 MVA, 132/33KV Substation at Odogunyan and
Ayobo with 132KV double – circuit transmission line
Ikeja west – Ayobo.
Omotosho – Epe – Aja 330KV double – circuit
transmission Line, Omotosho – Erukan – Ogijo 330KV
double Circuit transmission line
Provision of additional 2 x 150MVA, 330 / 132KV
Transformer capacity at Olorunsogo transmission station.
Federal Government College Laboratory refurbished in
Ijanikin – Lagos.
Rehabilitation of the National Theatre Iganmu – lagos.
Establishment of Nigerian Army dog Centre at Ipaja
lagos.
Establishment of Cancer Treatment Centre at the Federal
Medical Centre, Ebutte Metta.
Establishment of Maritime Institute at the University of
Lagos
EKITI STATE:
Establishment of a new Federal University in Oye – Ekiti
SURE – P Projects
e – wallet System in the distribution of the agricultural
inputs to the farmers and the Dry Season farming
projects
Rehabilitation of Ekon – Alaaye – Erinmo – Iwaraja road
in Ekiti and Osun States
Omuo – Ifaki road of Ado – Ilumoba – Agbado Ikare
Akoko Road sections A & B
Construction of Model Skill Acquisition Centre
OSUN STATE:
Ilesha Water Project (Ilesha Dam)
Ogun – Osun River Basin Projects and Ife Dam
e – wallet System in the distribution of the agricultural
inputs to the farmers and the Dry Season farming
Projects
Construction of Silos
Rehabilitation of Efon – Alaaye – Erinmo Ijesha –
Iwarga Road ( Ekiti – Osun States)
Oshogbo – Ede 13KV double – circuit transmission line,
2 x 60MVA, 132/ 33KV Substation at Ede
Modernisation of Obafemi Awolowo University (OAU)
Teaching Hospital Ile – Ife to meet International
standard.
OYO STATE:
Rehabilitation of the Ibadan – Ilorin Road (Dualization of
road)
Rehabilitation of the Ibadan – Lagos Road
Lagos – Ibadan new gauge Rail Line Service
University college Hospital Ibadan upgrade with facilities
to commence open heart surgeries
SURE – P Projects in Primary Health Care
e – Wallet system in the distribution of the Agricultural
Inputs to the farmers and the Dry season Farming
Projects.
Rehabilitation of the Ibadan Air port.
Ibadan – Oyo road dualisation
Construction/ Rehabilitation of Gbogan – Iwo Road
Rehabilitation of Odo oba – Takie – Gambari otte in
Oyo/Kwara States
Rehabilitation of the Old Oyo – Ogbomosho Road
2 x 60MVA, 132/33KV substation at Igangan and
132KV switching station at Igboora
New Abeokuta – Igboora – Lanlate 132KV double
Circuit Transmission Line and 132KV Tee – off at
Igboora – Igangan
Ganmo – Ogbomosho 132 KV Double – Circuit
transmission line and 2 x 60MVA,132KV Substation at
Ogbomosho
2 x 30/40MVA, 132/ 33KV Substation at Lanlate
Renovation of the Obafemi Awolowo Stadium Ibadan
OGUN STATE:
Olorunsogo Power Plant (750MW) successfully
completed and privatised
The Procter & Gamble Plant in Agbara Ogun States has
been commission(March 17,2014)
e – wallet System in the Distribution of the agricultural
inputs to the farmers
Dry Season Farming Projects
Lagos – Sagamu – Ore road rehabilitation
Rehabilitation/ Construction of Ijebu Igbo Ajegunle –
Araromi – Ife – Sekona Road (Section II) in Ogun State
Rehabilitation of Otta – Owode Road in Ogun State
NORTH – EAST GEO – POLITICAL ZONE
TARABA STATE:
SURE – P Project on primary Health Care ( PHC)
Construction of Takum and the Kashimbila Multi –
Purpose Dam Project in Yangtu.
Establishment of a new Federal University in Wakari,
Taraba
e – wallet system in the distribution of Agricultural
Inputs to the farmers and the Dry Season farming
projects
Construction of Silos in Taraba State
Construction of Jalingo – Kuna Lau Road (Section II)
Reinstatement of collapsed section of Wakari – Mutum
Biyu Road in Taraba State.
Rehabilitation of Wukari – Takum Road, Wukari /
Akwana Road.
Ongoing reconstructionof Zing – Yakoko – Monkin Road
Construction of Perishable Cargo Terminal in Jalingo
Ongoing recinstruction of Zing – Yakoko – Monkin road.
GOMBE STATE:
Reinstatement of Collapsed section of Gombe –
Potiskum road
Construction of Gombe – By Pass Road
Rehabilitation of Gombe – Numan – Yola Road (Section
II)
Establishment of a new Federal University in Kashere,
Gombe State
SURE – P projects on Primary Health Care (PHC)
e – Wallet System in the distribution of Agricultural
Inputs to the farmers and the Dry Season Farming
Projects
Construction of Export Crop Preservation and
Conditioning
Establishment and Construction of Special Almajiri
School
Provision of improved Cotton Seedlings Free of Charge
for farmers
Rehabilitation of Tumu – Pindaiga – Kashere Road
Establishment of a new Teaching Hospital
BAUCHI STATE:
Federal Government spent ₦11Billion on MDG’s Project
in Bauchi State as 2013.
SURE – P Projects on Primary Health Centres
e – wallet system in the distribution of the agricultural
inputs to farmers and the Dry Season farming Projects –
under which incentives were provided for nothing less
than 10,000 Dry Season rice farmers in Bauchi State.
Construction/ Rehabilitation of Yashi – Basher – Dengi
section in Bauchi and Plateau States and Rehabilitation
of Futuk – Yalo Road.
Rehabilitation of Futuk – Yalo Bauchi State
Establishment of Cancers Treatment Centre in Abubakar
Tafawa Balewa Teaching Hospital Bauchi
ADAMAWA STATE:
Establishment and Construction of Almajiri school
Provision of improved Cotton Seedlings free of charge
for farmers
e – wallet System for the distribution of agricultural
inputs to the farmers and Dry Season farming Projects
Rehabilitation and remodelling the Yola Airport
SURE – P Projects on Primary Health Centres
2 x 60 MVA, 132/33KV substation at Mubi, 2 x 60
MVA, 132 / 33 KV Substations at Gulak 132 KV double
circuit transmission line, 30 MVA, 132/33 KV mobitra at
Mayo Belwa, Adamawa state.
A new NAF Comprehensive Secondary School Yola
commissioned.
Partial State of emergency to enhance democratic
stability in Adamawa, Yobe and Borno States
Completion of Yola – Numan road in Adamawa
Ongoing 30MVA, 132/33KV Mobitra at Mayo Belwa,
Adamawa State. Yola – song – Litle at Gombi – Mubi –
Gulak 132kv Double Circuit Transmission Line. 2 x 60
MVA, 132/33kv Substations at song,Little Gombi, Mubi
and Gulak
YOBE STATE:
Gashua – Hadejia 132KV double – circuit trasnsmission
line, 2 x 60MVA, 132/33KV substation at Gashua and 2
x 132KV Line Bays Extension at Damaturu and Hadejia
Substations. Damaturu – Gashua 132KV double – circuit
Transmission Line and Damaturu 2 x 150 MVA,
330/132KV Substation.
SURE – P Projects on Primary Health Care (PHC)
e – Wallet system in the distribution of Agricultural
Inputs to the farmers and the Dry Season farming.
Establishment and construction of Special Almajiri
School
Provision of improved cotton Seedlings free of Charge
for farmers
Gashua Power Station
Desertification Control Projects: Establishment of 15
Row Green Belt (80Km) and Presidential Initiative on
Afforestation
BORNO STATE:
Rehabilitation of Uba – Mbala Road
Dualization of Maiduguri – Kano Road
SURE – P Projects on Primary Health Care. (PHC)
Rehabilitation of the Maiduguri Airport
Enugu – PH – Maiduguri Railway Fixed.
e – Wallet system for the distribution of agricultural
inputs to the farmers at subsidized rate and Dry Season
Farming projects.
Desertification Control Projects: Establishment of 15
Row Green Belt (80 Km) and Presidential Initiative on
Afforestation
Maiduguri 1 x 150 MVA, 330/ 132KV + 1 X 6 MVA
132 /33 KV substations.
Ongoing Maiduguri 1 x 150MVA, 330/132KV + 1x
60MVA, 132/33KV Substation
33KVA Transmission substation at Damboa / Biu Road.
Completion of Uba – Mbalala Road in Borno State
SOUTH – SOUTH GEO – POLITICAL ZONE
EDO STATE:
Ihovbor power Station (451 MW)
Rehabilitation of Benin – Ore – Sagamu dual carriage
way.
Asphalt overlay of 2km access road to the federal
Science & Technical College on Uromi
Emergency reinstatement of washout/gully erosion at
KM 127 + 000 at Auchi along Okene – Benin road and
14 + 000 Km along Auchi Agenebode Road
Benin – Auchi road rehabilitation and dualised
SURE – P Projects on Primary Health Care (PHC)
Ukpoke irrigation Projects
Water supply projects in Northern Ishan of Edo State (9
million litres per day plant capacity) for Uromi, Ubiaja,
Ugengu, Ugboha and Igueben
1 x 60 MVA , 132/ 33kv Substation reinforcement at
Ukpilla substation and 2nd Benin – Onitha 330kv single
– Circuit line
Land reclamation and Erosion Control works project at
Igonton – Igbanke and Iyom/Okhelen – Awo road Uromi
Modernisation of University of Benin Teaching Hospital,
Benin.
NDDC Reconstruction of Benin – Abraka phase I in
2012, FG Commissioned a cultural Industry Centre in
Auchi, Edo state.
Construction of Jetties at Agenebode
DELTA STATE:
* Ongoing construction of Itakpe – Ajaokuta – warri
modern railway
* Inauguration of Illah irrigation project.
* Second Niger Bridge – on going with SURE – P funds
* SURE – P Projects on Primary Health Care (PHC)
* Rehabilitation of Warri Refinery and the access roads
to the Refinery
* The NNDC Sponsored Projects: Nurse quarters,
electricity projects ultra modern Health Centre and Solar
Powered Water project
* Supply and installation of Laboratory equipment at
federal University of Petroleum Resources Effurun
* e – wallet system in the distribution of agricultural
inputs to the farmers and the Dry Season farming
projects
* New Library Projects at the Federal at the federal
Government College (FGC) Warri and at the federal
Government Girls College Ibusa
* The Proposed $16 B Gas City Project at Ogidigben in
Warri South West Area of Delta State to host: A gas
processing plant, a fertilizer plant and a petro chemical
plant
Sea Port
* 1 x 60 MVA Substation at Ughelli Power Plant and 1 x
30/40 MVA Substation reinforcement at Amukpe
* NDDC Construction of Orhorbo – Odurubuo, Kpakama
– Bomadi road phase I, Gberegolor – Ogriagbene Road
* Land reclamation and erosion control works projects in
Kurutie, Gbaramatu Clan Warri South, and Idumuje –
Unor Erosion Control Project.
* Canalization of Odobou – Ogbobagbene creek in
Burutu LGA
* Construction of Model Skill Acquisition Centre and the
Rehabilitation of Agric – skills Training Centre.
* Completion of the Capital dredging of the Lower River
Niger from Warri (Delta state) to Baro (Niger State)
532km.
* Supply of instruction materials to the Federal
Government College Warri
* Establishment of the Nigerian Maritime University and
the NIMASA Shipyard & Dockyard at Okerekoko Warri
CROSS RIVER STATE:
* Qua Falls Dam and Irrigation Project, Dry season
Farming and e – wallet system in the distribution of
agricultural inputs to the farmers
* Construction of an Export Crop Preservation and
conditioning centre
* Ongoing Obudu – Ogoja 132kv Double – Circuit
Transmission line, 2 x 30/40 MVA 132 /33kv Substation
at Ogoja
* Sure – P Projects on Primary Health Care and others.
* Periodic maintenance of Rumukurshi – Chokocho road;
Reconstruction & Pavement strengthening of Ikom –
Mfum Road
* Revitalised Calabar Substation (561mw)
* Rehabilitation of Ikom – Mfum (Cross River) –
Abakiliki – Mbok (Ebonyi)
* Construction of Calabar – Ikom – Katsina – Ala Road
in Benue state
* Rehabilitation of Margaret Ekpo International Airport
Calabar
* NDDC Ubana Utanga Water Project
* NDDC Electrification Project
* Modernisation of the University of Calabar Teaching
Hospital
* Land Reclamation and Erosion control works project in
Essien town – Ekorin in community.
* Construction of Agric Skills Training Centre in Cross
River state.
AKWA IBOM STATE:
* Complete of Nkari Earth dam
* Construction of 100,000 metric tonnes capacity silos
* e – wallet system in the distribution of agricultural
inputs to the farmers and the Dry season farming projects
* SURE – P Projects on Primary Health Care (PHC)
* Establishment of a new Federal Polytechnic in Ukana
* Approved building of Ibaka Deep Seaport
* Ibedu/Ibiako Rural Electrification Projects (Under
NREP) with JICA’S grant aid Intervention
* Land reclamation and erosion control works project in
Ibakang Nsit – Ikot Ekpo – Unyene Road, * Nsit Attai in
Akwa Ibom State.
* Remediation, Rehabilitation and Restoration of the Oil
impacted site at stubbs Creek, Eket –Akwa Ibom.
* NDDC –Idoro – Eaten – Itam Water Project
* Akwa Ibom State office of National Productivity
Centre was established
* Construction of 3 MDG/NDE skill Acquisition centres
in each of the three Senatorial Districts in Akwa Ibom
RIVERS STATE:
* Revived Omoku sub power station (225mw)
* Port Harcourt – Enugu – Maiduguri Rail Fixed
* Owerri – Port Harcourt Road ( Ongoing)
* SURE – P Projects on Primary Health Care (PHC)
* e – wallet in the distribution of subsided agricultural
inputs to the farmers and Dry Season farming Projects
* Rehabilitation of the Port Harcourt International
Airport.
* NDDC Electrification projects in Khana LGA and
Eleme
* 10 rooms hostel at Immigration Training School at
Ahoada
* Construction of Jetties at Degena.
* Establishment of Cancer Treatment Centre in
UNIPORT Teaching Hospital.
* Ongoing Rehabilitation of the Port Harcourt Refinery
* Transformation of the Onne Oil and Gas Free Zone
with 6 billion USD invested leading to the attraction of
150 companies into the zone with 30,000 jobs created to
date
* Establishment of a new Federal Oil and Gas
Polytechnic at Bonny
BAYELSA STATE:
* Periodic maintenance of East – West – Odi Road
* Gbarain sub power station (225mw) revitalized
* Establishment of a new federal University in Otuoke
* SURE – P Project on Primary Health Care (PHC)
* e –wallet system in the distribution of Agricultural
Inputs to the farmers and the Dry Season Farming
Projects
* Construction of the federal Government Secretariat in
Yanagoa.
* Central Ogbia Regional Water Supply Project in
Otuoke
* Construction of Jetties at Yenogoa
* NDDC Electrification Projects in Peremabiri –
Ogbokiri in Akassa Bayelsa State.
* Establishment of Maritime Institute at the Niger Delta
University Amasoma.

Post a Comment

 
Top